Aujan Interiors

Saddle café fit-out in Al Barsha, Dubai – photo 1

Restaurant Fit-Out Checklist for Dubai: From Lease to Opening Day

Opening a restaurant or café in Dubai involves hundreds of decisions, and missing one can delay your opening by weeks. This checklist follows the order a well-run fit-out actually happens in, so you know what to prepare at each stage. It is based on the restaurant, café and lounge projects we deliver across Dubai and Abu Dhabi.

1. Before you sign the lease

  • Check the unit’s existing services: power capacity, gas availability, drainage points and space for kitchen extraction.
  • Read the landlord’s fit-out guidelines, including shopfront, signage, working hours and approval steps.
  • Confirm the permitted activity for the unit (restaurant, café, takeaway).
  • Ask a fit-out contractor to survey the unit before you commit. Hidden constraints are much cheaper to discover now.

2. Concept and design

  • Define your concept, menu and service style. They shape the whole layout.
  • Plan seating capacity, bar and counter positions, and guest flow from entrance to table.
  • Agree the kitchen layout with your kitchen equipment supplier early.
  • Choose durable materials for high-footfall areas, and finishes that are easy to clean.
  • Plan lighting and acoustics as part of the design, not as an afterthought.

3. Approvals

  • Landlord or developer approval of the design drawings.
  • Authority permit for the fit-out works.
  • Civil defence approval for fire alarm, fire fighting and emergency exits.
  • Food safety approval for kitchen and food areas.

Our guide to fit-out approvals in Dubai explains each one in more detail.

4. Kitchen and MEP

  • Extraction and fresh air, sized for your cooking equipment.
  • Gas supply and safety systems where required.
  • Drainage and grease traps, coordinated with the kitchen layout.
  • Power and data for equipment, POS and music systems.
  • Air-conditioning that keeps both guests and kitchen staff comfortable.

Coordinating these early with an in-house MEP team prevents clashes on site.

5. Joinery, finishes and furniture

  • Bars, counters, banquettes and feature walls, ideally made in an in-house joinery workshop for quality and timing control.
  • Upholstery that stands up to daily use.
  • Signature finishes, such as decorative painting, that make the space memorable.

6. Build and handover

  • Agree a clear programme with key dates and a single point of contact.
  • Hold regular site meetings and review progress photos.
  • Plan inspections and snagging before the opening date.
  • Collect as-built drawings, warranties and maintenance information at handover.

7. Before opening day

  • Test all equipment, lighting scenes and music.
  • Train staff in the new space.
  • Photograph the finished interior for your marketing.

Working with one design and build team

The smoothest restaurant openings happen when design, approvals, MEP, joinery and construction are handled by one team. See our restaurant and café fit-outs, including ZouZou at The Dubai Mall and Saddle in Al Barsha, or read about the factors that shape a restaurant fit-out budget.

Planning a new restaurant or café? Request a quote and our team will help you plan every step.